Sign in
3YRSHenan Shunhang Shoes Co., Ltd.

Ikhtisar Perusahaan

Album Perusahaan

Informasi dasar

Kapasitas produk

Aliran produksi

Front machine process
The clamping mechanism of the fore helper is used to clamp the fore helper foot, and can adjust the tension force on the shoe last.

Peralatan produksi

Nama
Tidak ada
Jumlah
Terverifikasi
Sewing Machine
SI-9171
150
High-speed hydraulic cutting machine
HC-30T
10
Front Machine
SP-N738MAL
3
Terverifikasi

Informasi pabrik

Ukuran Pabrik
5,000-10,000 square meters
Lokasi Pabrik
East Road, 100 meters south of the South Ring of the South Section of Jiefang Road, Luohe Economic and Technological Development Zone, Zhaoling District, Luohe City, Henan Province
Jumlah Lini Produksi
5
Manufaktur Kontrak
OEM Service Offered, Design Service Offered, Buyer Label Offered
Nilai Output Tahunan
US$1 Million - US$2.5 Million

Line produksi

Line produksi
Supervisor
Jumlah Operator
TIDAK, In-line QC/QA
Terverifikasi
Needle car assembly line
1
50
2
Forming line
3
150
3
packaging line
2
20
2
Terverifikasi

Kontrol kualitas

Kualitas Manajemen Proses

Forming Inspection
Check the use of leather materials for uppers and soles, the size of finished shoes, and the acceptance of appearance quality.